Quick answers
What is this project?
Common Bio Medical Waste Treatment Facility (CBWTF) M/s Gopal Complex Fatehpur is a proposed waste management project in Salemabad, Fatehpur, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Gopal Complex.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Salemabad, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3 crore and a site of 1 acre.
When was it filed?
The application was filed on 12 Mar 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 12 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Gopal Complex |
| Land area | 1 acres (0.4 ha) |
| Project cost | ₹3 crore |
| Village / locality | Salemabad |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04620 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Salemabad, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 2 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 2.8 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — forest land use approved, 3.5 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 3.5 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 3.7 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 5.8 km away
- Laying of CS Gas Pipe Line (200mm) — forest land use approved, 6.1 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 6.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.