Quick answers
What is this project?
Protected Forest Land proposed for diversion for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on NH-335 (Fatehpur Raebareli Marg) at Km. 82.384 LHS (Design Ch. 203.710 RHS of NH-232) at Gata No. 882, Village: Bera Gadhiwa, Tehsil- Sadar, District: Fatehpur (Uttar Pradesh) is an approved fuel station in Bera Gadhiwa, Fatehpur, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Hemant Kumar.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 31 Dec 2024), as of 27 Nov 2026.
Where is it?
In Bera Gadhiwa, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 0.8 acres and 1,810 m² of forest land.
When was it filed?
The application was filed on 28 Jun 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 31 Dec 2024 |
| Application filed | 28 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hemant Kumar |
| Land area | 3,400 m² |
| Forest land | 1,810 m² |
| Project cost | ₹45 lakh |
| Village / locality | Bera Gadhiwa |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-06770 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.8 acres, this one is larger than 52% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bera Gadhiwa, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — forest land use approved, 2.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — in-principle approval, conditions pending, 4.8 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 4.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 5 km away
- Common Bio Medical Waste Treatment Facility (CBWTF) M/s Gopal Complex Fatehpur — under environmental review, 5.8 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 6.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 7.5 km away
- "Ordinary Sand Mining" from Riverbed of Ganga River — under environmental review, 8.2 km away
More from Hemant Kumar in Fatehpur
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — in-principle approval, conditions pending
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.