Quick answers
What is Ordinary Soil Mine Project?
Ordinary Soil Mine Project is an approved mining project in Nakata Ghat, Harraiya, Basti, Uttar Pradesh. The site covers 7 acres.
Who is building it?
The applicant is Durgesh kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Jun 2026), as of 27 Nov 2026.
Where is it?
In Nakata Ghat, Harraiya, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹21 lakh and a site of 7 acres.
When was it filed?
The application was filed on 27 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Jun 2026 |
| Application filed | 27 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Durgesh kumar |
| Land area | 7 acres (2.9 ha) |
| Project cost | ₹21 lakh |
| Village / locality | Nakata Ghat |
| Taluk / tehsil | Harraiya |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04664 |
In context
18 applications in Basti since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7 acres, this one is smaller than 61% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Nakata Ghat, Harraiya, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of protected forest land for Construction of approach road to the… — lapsed, 11.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 12.4 km away
- Improvement and up-gradation of newly declared National Highways NH-227B (84… — forest land use approved, 17.7 km away
- 4/6 Lane Ayodhya Bypass Total Length of 67.572 Kms ( Package 1 Northern… — under forest review, 21.9 km away
- "Ordinary Sand Mine" from riverbed of Ghaghra — environmental approval granted, 22.3 km away
- "Ordinary Sand Mine" from riverbed of Ghaghra — cleared for impact study, 22.3 km away
- Ordinary Soil Mining Project — environmental approval granted, 26 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 30.5 km away
More from Durgesh kumar in Basti
- Ordinary Soil Mining Project — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.