Quick answers
What is this project?
Ordinary Soil Excavation Project at Gata No.- 3649 Ga, Village- Rupau, Tehsil- Unnao, District- Unnao, State- Uttar Pradesh, area- 0.7250 ha, by Shri Umesh Kumar is an approved mining project in Rupau, Unnao, Uttar Pradesh. The site covers 1.8 acres.
Who is building it?
The applicant is Umesh Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Aug 2026), as of 27 Nov 2026.
Where is it?
In Rupau, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5 lakh and a site of 1.8 acres.
When was it filed?
The application was filed on 13 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Aug 2026 |
| Application filed | 13 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Umesh Kumar |
| Land area | 1.8 acres (0.7 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Rupau |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04741 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.8 acres, this one is smaller than 77% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Rupau, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Excavation — environmental approval granted, 4.2 km away
- Proposed industrial shed for Manufacturing of Aluminium Beverage Cans by M/s.… — environmental approval granted, 5.1 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — returned to applicant, 5.7 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — environmental approval granted, 5.7 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — cleared for impact study, 5.7 km away
- "Ordinary Soil Excavation Mining" Project at Gata No.- 550मि0, 580मि0, 580मि0,… — environmental approval granted, 6.1 km away
- Proposed 1.3 MHLPA (Million Hectolitres per Annum)Brewery Project Located at… — under environmental review, 6.2 km away
- Proposed 1.3 MHLPA (Million Hectolitres per Annum)Brewery Project Located at… — environmental approval granted, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.