Quick answers
What is this project?
Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao is a proposed industrial project in Matia, Unnao, Uttar Pradesh. The site covers 334.2 acres.
Who is building it?
The applicant is Uttar Pradesh Expressways Industrial Development Authority (Upeida).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 May 2025), as of 27 Nov 2026.
Where is it?
In Matia, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹421.3 crore and a site of 334.2 acres.
When was it filed?
The application was filed on 6 Jan 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao
Project details
| Official title | Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao at Village – Saray Katiyan & Village - Murtazanagar, Tehsil – Sadar, District – Unnao, Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) |
|---|---|
| Status | Cleared for impact study |
| Status since | 19 May 2025 |
| Application filed | 6 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 334.2 acres (135.3 ha) |
| Project cost | ₹421.3 crore |
| Village / locality | Matia |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03416 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Dec 2025 | Environmental approval granted | 334.2 acres | ₹421.3 crore |
| Early planning filed 6 Jan 2025 (this page) | Cleared for impact study | 334.2 acres | ₹421.3 crore |
In context
7 applications in Unnao since January 2022 are in the same category (Industry): 4 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Matia, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — environmental approval granted, 0 m away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — returned to applicant, 0 m away
- Proposed 1.3 MHLPA (Million Hectolitres per Annum)Brewery Project Located at… — under environmental review, 450 m away
- Proposed 1.3 MHLPA (Million Hectolitres per Annum)Brewery Project Located at… — environmental approval granted, 450 m away
- Environmental Clearance for the Proposed Aluminium Can Manufacturing Unit at… — under environmental review, 500 m away
- Proposed industrial shed for Manufacturing of Aluminium Beverage Cans by M/s.… — environmental approval granted, 600 m away
- Improvement and Rectification work of 05 nos. of MoRTH Identified Black Spot… — in-principle approval, conditions pending, 3.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to to Property of… — lapsed, 3.9 km away
More from Uttar Pradesh Expressways Industrial Development Authority (Upeida) in Unnao
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — returned to applicant
3 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects in Unnao
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.