Quick answers
What is this project?
Proposed 1.3 MHLPA (Million Hectolitres per Annum)Brewery Project Located at Plot No. 3, Industrial Manufacturing & Logistics Cluster (IMLC), Unnao, UPEIDA, Unnao, Uttar Pradesh is an approved industrial building project in Sarai Katian, Unnao, Uttar Pradesh. It plans 16 towers of up to 2 floors on 60.5 acres.
Who is building it?
The applicant is United Breweries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Mar 2026), as of 27 Nov 2026.
Where is it?
In Sarai Katian, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹736 crore and a site of 60.5 acres.
When was it filed?
The application was filed on 4 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Mar 2026 |
| Application filed | 4 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | United Breweries Limited |
| Use | Industrial |
| Towers | 16 |
| Floors (tallest) | 2 |
| Height | 12 m |
| Parking spaces | 335 |
| Land area | 60.5 acres (24.5 ha) |
| Built-up area | 1,14,739 m² (12,35,039 sq ft) |
| Plot area | 2,44,680 m² (26,33,711 sq ft) |
| Project cost | ₹736 crore |
| Village / locality | Sarai Katian |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02966 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 11 Sept 2026 | Under environmental review | 60.2 acres | ₹756 crore |
| New project filed 4 Dec 2025 (this page) | Environmental approval granted | 60.5 acres | ₹736 crore |
In context
28 applications in Unnao since January 2022 are in the same category (Buildings & townships): 12 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 60.5 acres, this one is larger than 64% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarai Katian, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 1.3 MHLPA (Million Hectolitres per Annum)Brewery Project Located at… — under environmental review, 0 m away
- Environmental Clearance for the Proposed Aluminium Can Manufacturing Unit at… — under environmental review, 400 m away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — environmental approval granted, 450 m away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — cleared for impact study, 450 m away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — returned to applicant, 450 m away
- Proposed industrial shed for Manufacturing of Aluminium Beverage Cans by M/s.… — environmental approval granted, 1.1 km away
- Improvement and Rectification work of 05 nos. of MoRTH Identified Black Spot… — in-principle approval, conditions pending, 3.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to to Property of… — lapsed, 4.1 km away
All 3 United Breweries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.