Proposed industrial shed for Manufacturing of Aluminium Beverage Cans by M/s. CANPACK INDIA PRIVATE LIMITED is an approved industrial building project in Sarai Katian, Unnao, Uttar Pradesh. It plans 16 towers of up to 1 floors on 60.5 acres.
Who is building it?
The applicant is Canpack India Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Nov 2025), as of 27 Nov 2026.
Where is it?
In Sarai Katian, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,300 crore and a site of 60.5 acres.
When was it filed?
The application was filed on 12 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Nov 2025 |
| Application filed | 12 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Canpack India Private Limited |
| Use | Industrial |
| Towers | 16 |
| Floors (tallest) | 1 |
| Height | 12 m |
| Parking spaces | 1,304 |
| Land area | 60.5 acres (24.5 ha) |
| Built-up area | 1,20,657 m² (12,98,740 sq ft) |
| Plot area | 2,44,875 m² (26,35,810 sq ft) |
| Project cost | ₹1,300 crore |
| Village / locality | Sarai Katian |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03005 |
In context
28 applications in Unnao since January 2022 are in the same category (Buildings & townships): 12 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 60.5 acres, this one is larger than 68% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarai Katian, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — returned to applicant, 600 m away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — environmental approval granted, 600 m away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — cleared for impact study, 600 m away
- Proposed 1.3 MHLPA (Million Hectolitres per Annum)Brewery Project Located at… — under environmental review, 1.1 km away
- Proposed 1.3 MHLPA (Million Hectolitres per Annum)Brewery Project Located at… — environmental approval granted, 1.1 km away
- Environmental Clearance for the Proposed Aluminium Can Manufacturing Unit at… — under environmental review, 1.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to to Property of… — lapsed, 3.9 km away
- "Ordinary Soil Excavation Mining" Project at Gata No.- 550मि0, 580मि0, 580मि0,… — environmental approval granted, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.