Quick answers
What is this project?
Sand/Morrum Mining Project at Gata 420, 530/2, 532, 709, and 716, 6.93 hectares Village – Shahpatan, Tehsil – Naraini, District – Banda, Uttar Pradesh is a proposed mining project in Shahpatan, Naraini, Banda, Uttar Pradesh. The site covers 17.1 acres.
Who is building it?
The applicant is Ram abhilash Shukla.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Shahpatan, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh and a site of 17.1 acres.
When was it filed?
The application was filed on 18 Apr 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mining Project at Gata 420, 530/2, 532, 709, and 716, 6.93 hectares Village…
Project details
| Status | More information requested |
|---|---|
| Status since | 10 Oct 2026 |
| Application filed | 18 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ram abhilash Shukla |
| Land area | 17.1 acres (6.9 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Shahpatan |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04756 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Apr 2026 (this page) | More information requested | 17.1 acres | ₹95 lakh |
| Early planning filed 8 Sept 2025 | Cleared for impact study | 17.1 acres | ₹95 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 17.1 acres, this one is smaller than 78% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Shahpatan, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining Project at Gata 420, 530/2, 532, 709, and 716, 6.93… — cleared for impact study, 0 m away
- Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor… — initial checks, 1.9 km away
- Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor… — under environmental review, 1.9 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 2.4 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Gata… — environmental approval granted, 2.8 km away
- "Sand/Morrum Mining" from Riverbed of Baghein River — environmental approval granted, 2.8 km away
- Environmental clearance for sand/morrum mining from riverbed of Baghain, at… — environmental approval granted, 3.9 km away
- Sand/Moram Mining Project — returned to applicant, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.