What is Developing? Open the mapMap

Forest land use approvedFuel stations · Banda, Uttar Pradesh

Proposed protected forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet

Proposed protected forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Gudha Kalan, Naraini, Banda, Uttar Pradesh. The site covers 0.8 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 14 Dec 2023).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed protected forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Gudha Kalan, Naraini, Banda, Uttar Pradesh. The site covers 0.8 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 14 Dec 2023), as of 27 Nov 2026.

Where is it?

In Gudha Kalan, Naraini, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹60 lakh; a site of 0.8 acres and 1,700 m² of forest land.

When was it filed?

The application was filed on 9 Apr 2023.

Project details

Official titleProposed protected forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet at Village:- Gudha Kalan, Tehsil:-Naraini, District:- Banda.
StatusForest land use approved
Status since14 Dec 2023
Application filed9 Apr 2023
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area3,200 m²
Forest land1,700 m²
Project cost₹60 lakh
Village / localityGudha Kalan
Taluk / tehsilNaraini
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05526

In context

12 applications in Banda since January 2022 are in the same category (Fuel stations): 9 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.8 acres, this one is smaller than 75% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gudha Kalan, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Banda

7 Indian Oil Corporation (IOCL) projects in Banda
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.