Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Baragaon, Kalpi, Jalaun, Uttar Pradesh. The site covers 47.9 acres.
Who is building it?
The applicant is Bluewaves Buildtech Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Baragaon, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.4 crore and a site of 47.9 acres.
When was it filed?
The application was filed on 19 Mar 2026.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Bhedi Dariya, Khand No.- 23/8 (Gata No.- 63/1, 64/1, 67 & 68), lease area- 19.370 Ha., Tehsil- Sarila, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Bluewaves Buildtech Pvt. Ltd. (Director- Shri Amit Dhingra) |
|---|---|
| Status | Under environmental review |
| Status since | 4 Nov 2026 |
| Application filed | 19 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Bluewaves Buildtech Private Limited |
| Land area | 47.9 acres (19.4 ha) |
| Project cost | ₹2.4 crore |
| Village / locality | Baragaon |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04988 |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 47.9 acres, this one is larger than 63% of them.
No other mining lease on record is within 500 m of this site; 12 have applied within 5 km.
Where it is
Baragaon, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — returned to applicant, 600 m away
- Pathreta Sand/ Morrum Mine — environmental approval granted, 1.6 km away
- Pathreta Sand/ Morrum Mine — cleared for impact study, 1.6 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa,… — lapsed, 1.7 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 2.1 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 2.1 km away
- Proposed riverbed Sand / Morrum mining Area-16.195 Ha Project at Betwa River… — cleared for impact study, 2.7 km away
- Proposed riverbed Sand / Morrum mining Area-16.195 Ha Project at Betwa River… — cleared for impact study, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.