What is Developing? Open the mapMap

Returned to applicantMining · Jalaun, Uttar Pradesh

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 23/12, Area 12.145 ha

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 23/12, Area 12.145 ha is a proposed mining project in Baragaon, Kalpi, Jalaun, Uttar Pradesh. The site covers 30 acres. Its stated project cost is ₹4.5 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 10 May 2025).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 23/12, Area 12.145 ha is a proposed mining project in Baragaon, Kalpi, Jalaun, Uttar Pradesh. The site covers 30 acres.

Who is building it?

The applicant is Arvind Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Baragaon, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹4.5 crore and a site of 30 acres.

When was it filed?

The application was filed on 4 Dec 2024.

Project details

Official titleProposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 23/12, Area 12.145 ha in Village- Bhedi Kharka, Tehsil- Sarila, District- Hamirpur, Uttar Pradesh of M/s Shubh Construction and Suppliers Prop. Shri Arvind Singh
StatusReturned to applicant
Status since10 May 2025
Application filed4 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantArvind Singh
Land area30 acres (12.2 ha)
Project cost₹4.5 crore
Village / localityBaragaon
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02120

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 30 acres, this one is smaller than 74% of them.

No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.

Where it is

Baragaon, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.