Quick answers
What is this project?
Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Faridpur, Suar, Rampur, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 18 Sept 2025), as of 27 Nov 2026.
Where is it?
In Faridpur, Suar, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.8 acres and 1,660 m² of forest land.
When was it filed?
The application was filed on 22 Apr 2025.
Project details
| Official title | Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet at Proposed Village:-Rasulpur Faridpur, Tehsil:-Swar, District:-Rampur. |
|---|---|
| Status | Forest land use approved |
| Status since | 18 Sept 2025 |
| Application filed | 22 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,200 m² |
| Forest land | 1,660 m² |
| Project cost | ₹60 lakh |
| Village / locality | Faridpur |
| Taluk / tehsil | Suar |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05085 |
In context
30 applications in Rampur since January 2022 are in the same category (Fuel stations): 21 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.8 acres, this one is larger than 57% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Faridpur, Suar, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.1509 Hectare of Protected Forest Land Under Social Forestry… — forest land use approved, 1.4 km away
- Amended BharatNet Project (Saidnagar-Rampur) — lapsed, 6.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 6.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 6.7 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — initial checks, 7 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — more information requested, 9.3 km away
- Diversion of 0.9241 Ha. forest land for Jio Digital Fibre Private Limited… — initial checks, 9.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — lapsed, 9.9 km away
More from Indian Oil Corporation Limited (IOCL) in Rampur
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — more information requested
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved
13 Indian Oil Corporation (IOCL) projects in Rampur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.