Quick answers
What is this project?
Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Sarakthal Chak, Tanda, Rampur, Uttar Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Sept 2025), as of 27 Nov 2026.
Where is it?
In Sarakthal Chak, Tanda, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.7 acres and 1,760 m² of forest land.
When was it filed?
The application was filed on 21 Apr 2025.
Project details
| Official title | Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet at Proposed Village:-Chak Sarakthal, Tehsil:-Tanda, District:-Rampur. |
|---|---|
| Status | Forest land use approved |
| Status since | 17 Sept 2025 |
| Application filed | 21 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,000 m² |
| Forest land | 1,760 m² |
| Project cost | ₹60 lakh |
| Village / locality | Sarakthal Chak |
| Taluk / tehsil | Tanda |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05634 |
In context
30 applications in Rampur since January 2022 are in the same category (Fuel stations): 21 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.7 acres, this one is smaller than 57% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarakthal Chak, Tanda, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — lapsed, 900 m away
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — environmental approval granted, 900 m away
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — cleared for impact study, 900 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 1.1 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 4.3 km away
- Ordinary Sand Mine — environmental approval granted, 6 km away
- "Ordinary Sand Mining" Project — environmental approval granted, 6 km away
- "Ordinary Sand (Category-II) Mining" from Riverbed of Kosi River — environmental approval granted, 6.1 km away
More from Indian Oil Corporation Limited (IOCL) in Rampur
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — more information requested
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved
13 Indian Oil Corporation (IOCL) projects in Rampur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.