Quick answers
What is this project?
Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Reliance BP Mobility Limited Retail Outlet at Moradabad-Nainital Road (MDR-65W), KM-34, Ch. 33.904 to Ch. 33.959 (LHS) Khasra/Gata No-58, Vill- Sarakthal, Tehsil-Tanda, Distt- Rampur (UP) is a lapsed fuel station in Sarakthal, Tanda, Rampur, Uttar Pradesh. The site covers 1.4 acres.
Who is building it?
The applicant is Reliance Bp Mobility Limited Up (West).
Has it been approved?
No. The application was lapsed on 19 Apr 2026, so it is no longer under consideration.
Where is it?
In Sarakthal, Tanda, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 1.4 acres and 2,150 m² of forest land.
When was it filed?
The application was filed on 18 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Apr 2026 |
| Application filed | 18 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Reliance Bp Mobility Limited Up (West) |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 2,150 m² |
| Project cost | ₹65 lakh |
| Village / locality | Sarakthal |
| Taluk / tehsil | Tanda |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06584 |
In context
30 applications in Rampur since January 2022 are in the same category (Fuel stations): 21 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1.4 acres, this one is larger than 93% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarakthal, Tanda, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 900 m away
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — environmental approval granted, 1.6 km away
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — cleared for impact study, 1.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 1.9 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 5.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 6.7 km away
- Ordinary Sand Mine — environmental approval granted, 6.8 km away
- "Ordinary Sand Mining" Project — environmental approval granted, 6.8 km away
More from Reliance Bp Mobility Limited Up (West) in Rampur
- Diversion of 0.2400 Hectare of Protected Forest land (FCA 1980 for non… — forest land use approved
All 23 Reliance Bp Mobility projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.