Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal Energy Limited Retail Outlet is an approved fuel station in Piper Pur, Amethi, Uttar Pradesh. The site covers 1.4 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Apr 2026), as of 27 Nov 2026.
Where is it?
In Piper Pur, Amethi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh; a site of 1.4 acres and 990 m² of forest land.
When was it filed?
The application was filed on 5 Mar 2026.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal Energy Limited Retail Outlet at Village:- Piparpur, Tehsil:- Amethi, District:- Amethi (U.P.) |
|---|---|
| Status | Forest land use approved |
| Status since | 29 Apr 2026 |
| Application filed | 5 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 990 m² |
| Project cost | ₹75 lakh |
| Village / locality | Piper Pur |
| Taluk / tehsil | Amethi |
| District | Amethi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05239 |
In context
6 applications in Amethi since January 2022 are in the same category (Fuel stations): 6 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Piper Pur, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — forest land use approved, 600 m away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 2.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 4.1 km away
- Rehabilitation & Up-gradation from design Km 0.000 to Km. 69.280 of NH-931… — more information requested, 11.4 km away
- Protected Forest Land proposed to be diverted for the Construction of Amethi… — in-principle approval, conditions pending, 12.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 12.4 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — in-principle approval, conditions pending, 13.5 km away
- Laying of 10" dia Steel Pipeline from NH-731 point to Musafirkhana Chauraha on… — forest land use approved, 19 km away
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.