Quick answers
What is this project?
Rehabilitation & Up-gradation from design Km 0.000 to Km. 69.280 of NH-931 (Pratapgarh - Amethi - Gauriganj - Musafirkhana) to two lane with paved shoulder on Engineering, Procurement & Construction (EPC) mode in the State of Uttar Pradesh is a proposed road project in Asaidapur, Gauriganj, Amethi, Uttar Pradesh. The site covers 496 acres.
Who is building it?
The applicant is Ministry of Road Transport & Highways.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Asaidapur, Gauriganj, Amethi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹720.8 crore; a site of 496 acres and 4,000 m² of forest land.
When was it filed?
The application was filed on 5 Aug 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 17 Sept 2026 |
| Application filed | 5 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 496 acres (200.7 ha) |
| Forest land | 4,000 m² |
| Project cost | ₹720.8 crore |
| Village / locality | Asaidapur |
| Taluk / tehsil | Gauriganj |
| District | Amethi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05804 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Asaidapur, Gauriganj, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed to be diverted for the Construction of Amethi… — in-principle approval, conditions pending, 1.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 7.9 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 9 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — in-principle approval, conditions pending, 9.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 9.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — forest land use approved, 11.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — forest land use approved, 11.9 km away
- Residential and Non-Residential Buildings of Police Line Amethi — environmental approval granted, 13.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.