Quick answers
What is this project?
Proposed Lilo of Both Ckts of 765KV Varanasi - Kanpur (Gis) D/C Line at Fatehpur for Establishment of Transmission System for Evacuation of Power From Rez in Rajasthan (20gw) Under Phase-Iii, Part-I is a proposed power project in Meerpur Kurusti, Fatehpur, Uttar Pradesh. The site covers 1,699.8 acres.
Who is building it?
The applicant is Rajasthan Part I Power Transmission Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Meerpur Kurusti, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹247.5 crore; a site of 1,699.8 acres and 7 acres (2.8 ha) of forest land.
When was it filed?
The application was filed on 7 Jun 2026.
Project details
| Official title | Construction of Proposed Lilo of Both Ckts of 765KV Varanasi - Kanpur (Gis) D/C Line at Fatehpur for Establishment of Transmission System for Evacuation of Power From Rez in Rajasthan (20gw) Under Phase-Iii, Part-I. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 20 Nov 2026 |
| Application filed | 7 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Rajasthan Part I Power Transmission Limited |
| Land area | 1,699.8 acres (687.9 ha) |
| Forest land | 7 acres (2.8 ha) |
| Project cost | ₹247.5 crore |
| Village / locality | Meerpur Kurusti |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05293 |
Where it is
Meerpur Kurusti, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Steel Melting Shop (Induction Furnace 4X30 Ton, LRF and CCM) and TMT… — environmental approval granted, 6.7 km away
- Proposed Steel Melting Shop (Induction Furnace 4X30 Ton, LRF and CCM) and TMT… — cleared for impact study, 6.7 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 7.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 8.8 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 9.6 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 13 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 13.1 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 13.3 km away
All 6 Rajasthan Part I projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.