Quick answers
What is this project?
Protected Forest Land proposed for diversion for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on Shah Banarsi Shyampur Dugreai Hasanpur Marg (ODR) in Km. 5 (Ch. 4.200-4.235) RHS is an approved fuel station in Banarsi, Fatehpur, Uttar Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is Hemant Kumar.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 26 Mar 2025), as of 27 Nov 2026.
Where is it?
In Banarsi, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 0.2 acres and 110 m² of forest land.
When was it filed?
The application was filed on 11 Jan 2025.
Project details
| Official title | Protected Forest Land proposed for diversion for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on Shah Banarsi Shyampur Dugreai Hasanpur Marg (ODR) in Km. 5 (Ch. 4.200-4.235) RHS at Gata No. 1158 Village: Banarsi, Tehsil-Sadar, District: Fatehpur (Uttar Pradesh). |
|---|---|
| Status | Forest land use approved |
| Status since | 26 Mar 2025 |
| Application filed | 11 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hemant Kumar |
| Land area | 1,000 m² |
| Forest land | 110 m² |
| Project cost | ₹45 lakh |
| Village / locality | Banarsi |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07149 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.2 acres, this one is smaller than 98% of them.
Where it is
Banarsi, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 5.7 km away
- Proposed Lilo of Both Ckts of 765KV Varanasi - Kanpur (Gis) D/C Line at… — in-principle approval, conditions pending, 7.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 10.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — forest land use approved, 10.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 11.1 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — forest land use approved, 11.4 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 11.5 km away
- Widening of Fatehpur-Baberu-Attara-Naraini-Kartal Marg (SH-71) From Ch. 1.100… — lapsed, 13.1 km away
More from Hemant Kumar in Fatehpur
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — in-principle approval, conditions pending
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.