Quick answers
What is this project?
Proposed Steel Melting Shop (Induction Furnace 4X30 Ton, LRF and CCM) and TMT Bar (3,45,708 TPA) is an approved industrial project in Chakki, Bindki, Fatehpur, Uttar Pradesh. The site covers 16.6 acres.
Who is building it?
The applicant is S.R. Concast Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Jul 2026), as of 27 Nov 2026.
Where is it?
In Chakki, Bindki, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹240 crore and a site of 16.6 acres.
When was it filed?
The application was filed on 22 May 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Jul 2026 |
| Application filed | 22 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | S.R. Concast Private Limited |
| Land area | 16.6 acres (6.7 ha) |
| Project cost | ₹240 crore |
| Village / locality | Chakki |
| Taluk / tehsil | Bindki |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04729 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 May 2026 (this page) | Environmental approval granted | 16.6 acres | ₹240 crore |
| Early planning filed 2 May 2025 | Cleared for impact study | 16.6 acres | ₹240 crore |
Where it is
Chakki, Bindki, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Steel Melting Shop (Induction Furnace 4X30 Ton, LRF and CCM) and TMT… — cleared for impact study, 0 m away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 5.3 km away
- Proposed Lilo of Both Ckts of 765KV Varanasi - Kanpur (Gis) D/C Line at… — in-principle approval, conditions pending, 6.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested, 11 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach of… — lapsed, 11 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 11.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 11.7 km away
- Common Bio Medical Waste Treatment Facility (CBWTF) M/s Gopal Complex Fatehpur — under environmental review, 12.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.