Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Apr 2025 |
| Application filed | 27 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Torrent Gas Private Limited |
| Land area | 1.7 acres (0.7 ha) |
| Forest land | 3,540 m² |
| Project cost | ₹60 lakh |
| Village / locality | Nayagaon |
| Taluk / tehsil | Nawabganj |
| District | Bara Banki |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05469 |
In context
25 applications in Bara Banki since January 2022 are in the same category (Buildings & townships): 10 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.7 acres, this one is smaller than 68% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nayagaon, Nawabganj, Bara Banki, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 0 m away
- Proposed BPCL Retail Outlet on Barabanki-Bahraich Road (NH-927) in between Km.… — forest land use approved, 200 m away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 2.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to BPCL… — forest land use approved, 3 km away
- Diversion For Construction Of Access To Property Of "KB Enterprises",(Hotel… — initial checks, 3.7 km away
- Proposed protected forest land to be diverted for Entry & Exit approach to… — lapsed, 3.7 km away
- Proposed protected forest land to be diverted for Entry & Exit approach to… — more information requested, 3.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 4.2 km away
More from Torrent Gas Private Limited in Bara Banki
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — lapsed
- Proposed Forest Land to be diverted for Laying of Gas Pipeline — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved
- Proposed Diversion for Laying of Gas Pipeline along Faizabad Road (Old NH-27),… — forest land use approved
- Proposed protected forest land to be diverted for Laying of Gas Pipeline along… — lapsed
6 Torrent Gas projects in Bara Banki
All 30 Torrent Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.