What is Developing? Open the mapMap

Forest land use approvedPipelines · Bara Banki, Uttar Pradesh

Proposed Forest Land to be diverted for Laying of Gas Pipeline

Proposed Forest Land to be diverted for Laying of Gas Pipeline is an approved pipeline project in Obaree (Ct), Nawabganj, Bara Banki, Uttar Pradesh. The site covers 0.9 acres. Its stated project cost is ₹40 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 9 Sept 2025).

See it on the live map All projects in Bara Banki

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed Forest Land to be diverted for Laying of Gas Pipeline in District:- Barabanki.
StatusForest land use approved
Status since9 Sept 2025
Application filed21 Apr 2024
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantTorrent Gas Private Limited
Land area3,800 m²
Forest land3,750 m²
Project cost₹40 lakh
Village / localityObaree (Ct)
Taluk / tehsilNawabganj
DistrictBara Banki
StateUttar Pradesh
Location fromSite area on record
Our referenceWID-UP-06933

In context

6 applications in Bara Banki since January 2022 are in the same category (Pipelines): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Obaree (Ct), Nawabganj, Bara Banki, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Torrent Gas Private Limited in Bara Banki

6 Torrent Gas projects in Bara Banki
All 30 Torrent Gas projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.