Project details
| Official title | Proposed Diversion for Laying of Gas Pipeline along Faizabad Road (Old NH-27), in between (CH. No. 29.800 to CH. No. 24.600, LHS), & Barabanki-Dewa Road (Old NH-27), in between (CH. No. 0.000 to CH. No. 11.560, LHS), in District: - Barabanki. |
|---|---|
| Status | Forest land use approved |
| Status since | 28 Feb 2024 |
| Application filed | 1 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Torrent Gas Private Limited |
| Land area | 1.1 acres (0.5 ha) |
| Forest land | 1.1 acres (0.5 ha) |
| Project cost | ₹12.5 crore |
| Village / locality | Bahadurpur |
| Taluk / tehsil | Nawabganj |
| District | Bara Banki |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05595 |
In context
6 applications in Bara Banki since January 2022 are in the same category (Pipelines): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bahadurpur, Nawabganj, Bara Banki, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Manufacturing of Cationic dye-able Polyester Staple Fiber by in-line Addition… — under environmental review, 100 m away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 400 m away
- Diversion of forest land for the construction of an approach road to… — lapsed, 550 m away
- Ordinary Soil Mine — environmental approval granted, 2.9 km away
- Diversion of Forest Land for the Laying of Underground Optical Fiber Line at… — lapsed, 3.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to Commercial… — forest land use approved, 3.4 km away
- "Ordinary Earth Mine" Village- Gadiya, Gata No.-111, 112Mi, 113, 131/1 & 134,… — environmental approval granted, 3.8 km away
- "Ordinary Earth Mine", Village- Gadiya, Gata No.- 83, 120 & 121, Lease Area-… — environmental approval granted, 3.9 km away
More from Torrent Gas Private Limited in Bara Banki
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — lapsed
- Proposed Forest Land to be diverted for Laying of Gas Pipeline — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit approach to… — lapsed
- Proposed protected forest land to be diverted for Laying of Gas Pipeline along… — lapsed
6 Torrent Gas projects in Bara Banki
All 30 Torrent Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.