Quick answers
What is Amende BharatNet Project (Sarsawan-Saharanpur)?
Amende BharatNet Project (Sarsawan-Saharanpur) is a lapsed telecom project in Ahmadpur, Nakur, Saharanpur, Uttar Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is Rail Vikas Nigam Limited (RVNL).
Has it been approved?
No. The application was lapsed on 3 Sept 2026, so it is no longer under consideration.
Where is it?
In Ahmadpur, Nakur, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹15 lakh; a site of 0.2 acres and 760 m² of forest land.
When was it filed?
The application was filed on 31 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Sept 2026 |
| Application filed | 31 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Rail Vikas Nigam Limited (RVNL) |
| Land area | 800 m² |
| Forest land | 760 m² |
| Project cost | ₹15 lakh |
| Village / locality | Ahmadpur |
| Taluk / tehsil | Nakur |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-05479 |
In context
15 applications in Saharanpur since January 2022 are in the same category (Telecom): 1 approved, 3 filed or under review, and 11 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 83% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ahmadpur, Nakur, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Nayara… — forest land use approved, 700 m away
- Diversion of Forest land for "Construction of Entry/Exist Approach to IOCL… — forest land use approved, 1.1 km away
- Diversion of 0.145 Ha Forest land for "Construction of Entry/Exist Approach to… — forest land use approved, 1.1 km away
- Diversion of 0.16 Ha Forest Land for "Construction of Entry / Exit approach to… — forest land use approved, 3.8 km away
- Diversion of Forest land for "Construction of Entry/Exist Approach to HPCL… — forest land use approved, 3.9 km away
- 33 KV HT line Shifting for underground Laying of 33 Power Line Along… — in-principle approval, conditions pending, 4.4 km away
- Diversion of Forest Land for Replacement of existing 11KV overhead lines with… — forest land use approved, 4.6 km away
- Diversion of Forest land for "Construction of Entry/Exist Approach to BPCL… — forest land use approved, 5 km away
More from Rail Vikas Nigam Limited (RVNL) in Saharanpur
- Amended Bharatnet Project (Muzaffarabad-Saharanpur) — lapsed
- Amended BharatNet Project (Rampur Maniharan-Saharanpur) — lapsed
3 Rail Vikas Nigam (RVNL) projects in Saharanpur
All 82 Rail Vikas Nigam (RVNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.