Quick answers
What is this project?
Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Nayara Energy Limited Noida, Retail Outlet On NH--344 (OLD NH-73), Gaglheri Saharanpur Sarsawa Road (ODR) In KM No.-21, CH. 20.708 (LHS), At Khasra No. 83M, Village: Ghosipura, Tehsil: Nakur, District: Saharanpur (Uttar Pradesh) is an approved fuel station in Ghasipura, Nakur, Saharanpur, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is M/S Nayara Energy Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 1 Sept 2025), as of 27 Nov 2026.
Where is it?
In Ghasipura, Nakur, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0.5 acres and 840 m² of forest land.
When was it filed?
The application was filed on 15 Jul 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 1 Sept 2025 |
| Application filed | 15 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 2,100 m² |
| Forest land | 840 m² |
| Project cost | ₹65 lakh |
| Village / locality | Ghasipura |
| Taluk / tehsil | Nakur |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05760 |
In context
16 applications in Saharanpur since January 2022 are in the same category (Fuel stations): 12 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.5 acres, this one is smaller than 81% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghasipura, Nakur, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest land for "Construction of Entry/Exist Approach to IOCL… — forest land use approved, 400 m away
- Amende BharatNet Project (Sarsawan-Saharanpur) — lapsed, 700 m away
- Diversion of 0.145 Ha Forest land for "Construction of Entry/Exist Approach to… — forest land use approved, 1.7 km away
- Diversion of Forest land for "Construction of Entry/Exist Approach to HPCL… — forest land use approved, 3.2 km away
- 33 KV HT line Shifting for underground Laying of 33 Power Line Along… — in-principle approval, conditions pending, 3.8 km away
- Diversion of 0.16 Ha Forest Land for "Construction of Entry / Exit approach to… — forest land use approved, 4.4 km away
- Diversion of Forest land for "Construction of Entry/Exist Approach to BPCL… — forest land use approved, 4.6 km away
- Diversion of Forest Land for Replacement of existing 11KV overhead lines with… — forest land use approved, 5.2 km away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.