Quick answers
What is this project?
Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000 of NH-727A (Km.171.00 of Sonauli Balia Marg, Old SH-01, near Mahadahan Chauraha) to Km. 61.500 of NH-727B (Km. 178.500 of Sonauli Balia Marg, Old SH-01, near Ahirauli Village), design length of 14.700 Km. under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh is a proposed road project in Bhimpur, Salempur, Deoria, Uttar Pradesh. The site covers 173.6 acres.
Who is building it?
The applicant is Ministry of Road Transport & Highways.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bhimpur, Salempur, Deoria, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,348.1 crore; a site of 173.6 acres and 7.6 acres (3.1 ha) of forest land.
When was it filed?
The application was filed on 29 Mar 2025.
Project details
| Official title | Construction of Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000 of NH-727A (Km.171.00 of Sonauli Balia Marg, Old SH-01, near Mahadahan Chauraha) to Km. 61.500 of NH-727B (Km. 178.500 of Sonauli Balia Marg, Old SH-01, near Ahirauli Village), design length of 14.700 Km. under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh. |
|---|---|
| Status | More information requested |
| Status since | 18 Aug 2025 |
| Application filed | 29 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 173.6 acres (70.2 ha) |
| Forest land | 7.6 acres (3.1 ha) |
| Project cost | ₹1,348.1 crore |
| Village / locality | Bhimpur |
| Taluk / tehsil | Salempur |
| District | Deoria |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05610 |
In context
8 applications in Deoria since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhimpur, Salempur, Deoria, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000… — lapsed, 100 m away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — lapsed, 4.1 km away
- Rehabilitation & up gradation of Tamkhuiraj – Salempur (NH – 727B) in Deoria… — forest land use approved, 7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — in-principle approval, conditions pending, 8.7 km away
- Widening & Strengthening to Two Lane with Paved Shoulder/Four Lane with paved… — more information requested, 10.5 km away
- Improvement & Upgradation of Section of Km 131.500 to Km 176.485 (44.985 Km)… — forest land use approved, 10.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — more information requested, 11.4 km away
More from Ministry of Road Transport & Highways in Deoria
- Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000… — lapsed
- Deoria Bypass From Existing Km. 27.140 to Existing Km. 46.780 (Design Km.… — more information requested
- Widening & Strengthening to Two Lane with Paved Shoulder/Four Lane with paved… — more information requested
- Improvement & Upgradation of Section of Km 131.500 to Km 176.485 (44.985 Km)… — forest land use approved
- Rehabilitation & up gradation of Tamkhuiraj – Salempur (NH – 727B) in Deoria… — forest land use approved
- Improvement & Upgradation of Section of Km 131.500 to Km 176.485 (44.985 Km)… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.