What is Developing? Open the mapMap

LapsedRoads & highways · Deoria, Uttar Pradesh

Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000 of NH-727A (Km.171.00 of Sonauli Balia Marg, Old SH-01, near Mahadahan Chauraha) to Km. 61.500 of NH-727B (Km. 178.500 of Sonauli Balia Marg, Old SH-01, near Ahirauli Village), design length of 14.700 Km. under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh

Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000 of NH-727A (Km.171.00 of Sonauli Balia Marg, Old SH-01, near Mahadahan Chauraha) to Km. 61.500 of NH-727B (Km. 178.500 of Sonauli Balia Marg, Old SH-01, near Ahirauli Village), design length of 14.700 Km. under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh is a lapsed road project in Piasi, Salempur, Deoria, Uttar Pradesh. The site covers 174.3 acres. Its stated project cost is ₹1,348.1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 23 Nov 2024).

See it on the live map All projects in Deoria

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000 of NH-727A (Km.171.00 of Sonauli Balia Marg, Old SH-01, near Mahadahan Chauraha) to Km. 61.500 of NH-727B (Km. 178.500 of Sonauli Balia Marg, Old SH-01, near Ahirauli Village), design length of 14.700 Km. under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh is a lapsed road project in Piasi, Salempur, Deoria, Uttar Pradesh. The site covers 174.3 acres.

Who is building it?

The applicant is Ministry of Road Transport & Highways.

Has it been approved?

No. The application was lapsed on 23 Nov 2024, so it is no longer under consideration.

Where is it?

In Piasi, Salempur, Deoria, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1,348.1 crore; a site of 174.3 acres and 4.2 acres (1.7 ha) of forest land.

When was it filed?

The application was filed on 1 Jun 2024.

Project details

Official titleProposal For Construction of Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000 of NH-727A (Km.171.00 of Sonauli Balia Marg, Old SH-01, near Mahadahan Chauraha) to Km. 61.500 of NH-727B (Km. 178.500 of Sonauli Balia Marg, Old SH-01, near Ahirauli Village), design length of 14.700 Km. under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh.
StatusLapsed
Status since23 Nov 2024
Application filed1 Jun 2024
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Road Transport & Highways
Land area174.3 acres (70.6 ha)
Forest land4.2 acres (1.7 ha)
Project cost₹1,348.1 crore
Village / localityPiasi
Taluk / tehsilSalempur
DistrictDeoria
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05987

In context

8 applications in Deoria since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Piasi, Salempur, Deoria, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Road Transport & Highways in Deoria

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.