What is Developing? Open the mapMap

LapsedRoads & highways · Bijnor, Uttar Pradesh

Provincial Work Department (PWD) Bijnor by Proposed for Protected Forest Land is required to be diverted (FCA 1980 For Non forestry Purposed) 2 Lane Widening of Panipat-Khatima Road (Raoli road) (S.H-12) from Km Ch.112.675 to 121.075 (total length 8.40 km)

Provincial Work Department (PWD) Bijnor by Proposed for Protected Forest Land is required to be diverted (FCA 1980 For Non forestry Purposed) 2 Lane Widening of Panipat-Khatima Road (Raoli road) (S.H-12) from Km Ch.112.675 to 121.075 (total length 8.40 km) is a lapsed road project in Muzaffarpur Kesho, Bijnor, Uttar Pradesh. The site covers 13.5 acres. Its stated project cost is ₹18.6 crore. As of 27 Nov 2026, its status is “Lapsed” (since 18 Jul 2023).

See it on the live map All projects in Bijnor

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Provincial Work Department (PWD) Bijnor by Proposed for Protected Forest Land is required to be diverted (FCA 1980 For Non forestry Purposed) 2 Lane Widening of Panipat-Khatima Road (Raoli road) (S.H-12) from Km Ch.112.675 to 121.075 (total length 8.40 km) is a lapsed road project in Muzaffarpur Kesho, Bijnor, Uttar Pradesh. The site covers 13.5 acres.

Who is building it?

The applicant is Provincial Division Pwd Bijnor.

Has it been approved?

No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.

Where is it?

In Muzaffarpur Kesho, Bijnor, Uttar Pradesh.

How big is it?

It has a stated cost of ₹18.6 crore; a site of 13.5 acres and 6.7 acres (2.7 ha) of forest land.

When was it filed?

The application was filed on 19 Jan 2023.

Project details

Official titleConstruction of Provincial Work Department (PWD) Bijnor by Proposed for Protected Forest Land is required to be diverted (FCA 1980 For Non forestry Purposed) 2 Lane Widening of Panipat-Khatima Road (Raoli road) (S.H-12) from Km Ch.112.675 to 121.075 (total length 8.40 km) in Tehsil & District Bijnor Uttar Pradesh.
StatusLapsed
Status since18 Jul 2023
Application filed19 Jan 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantProvincial Division Pwd Bijnor
Land area13.5 acres (5.5 ha)
Forest land6.7 acres (2.7 ha)
Project cost₹18.6 crore
Village / localityMuzaffarpur Kesho
Taluk / tehsilBijnor
DistrictBijnor
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05642

In context

22 applications in Bijnor since January 2022 are in the same category (Roads & highways): 8 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 13.5 acres, this one is larger than 63% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Muzaffarpur Kesho, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Provincial Division Pwd Bijnor in Bijnor

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.