Quick answers
What is this project?
Provincial Work Department (PWD) Bijnor by Proposed for Protected Forest Land is required to be diverted (FCA 1980 For Non forestry Purposed) 2 Lane Widening of Panipat-Khatima Road (Raoli road) (S.H-12) from Km Ch.112.675 to 121.075 (total length 8.40 km) is a proposed road project in Madsudanpur Bahadar, Bijnor, Uttar Pradesh. The site covers 6.7 acres.
Who is building it?
The applicant is Provincial Division Pwd Bijnor.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Madsudanpur Bahadar, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹13.1 crore; a site of 6.7 acres and 6.7 acres (2.7 ha) of forest land.
When was it filed?
The application was filed on 8 Jul 2023.
Project details
| Official title | Construction of Provincial Work Department (PWD) Bijnor by Proposed for Protected Forest Land is required to be diverted (FCA 1980 For Non forestry Purposed) 2 Lane Widening of Panipat-Khatima Road (Raoli road) (S.H-12) from Km Ch.112.675 to 121.075 (total length 8.40 km) in Tehsil & District Bijnor Uttar Pradesh. |
|---|---|
| Status | More information requested |
| Status since | 30 Apr 2026 |
| Application filed | 8 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Provincial Division Pwd Bijnor |
| Land area | 6.7 acres (2.7 ha) |
| Forest land | 6.7 acres (2.7 ha) |
| Project cost | ₹13.1 crore |
| Village / locality | Madsudanpur Bahadar |
| Taluk / tehsil | Bijnor |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06944 |
In context
22 applications in Bijnor since January 2022 are in the same category (Roads & highways): 8 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 6.7 acres, this one is smaller than 68% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Madsudanpur Bahadar, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NOC/WILD LIFE CLEARANCE FOR PROVINCIAL WORK DEPARTMENT BIJNOR Proposed… — decision issued, 0 m away
- Provincial Work Department (PWD) Bijnor by Proposed for Protected Forest Land… — lapsed, 0 m away
- Proposed for NOC/Wildlife Clearence of Entry/Exit approach to IOCL Retail Outlet — more information requested, 4.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 7.5 km away
- Proposed Protected Forest Land to be diverted for Laying of Natural Gas Pipe… — under forest review, 8 km away
- Thanabhawan to Bijnor Connectivity — under wildlife review, 8.2 km away
- Proposed Protected Forest Land to be diverted (Forest Conservation Act 1980… — in-principle approval, conditions pending, 10.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 10.7 km away
More from Provincial Division Pwd Bijnor in Bijnor
- Proposed Protected Forest Land To Be Diverted (Forest Conservation Act 1980… — initial checks
- Proposed Protected Forest Land To Be Diverted (Forest Conservation Act 1980… — initial checks
- Proposed Protected Forest Land to be diverted (Forest Conservation Act 1980… — in-principle approval, conditions pending
- Proposed Protected Forest Land to Be Diverted (Forest Conservation Act 1980… — more information requested
- Proposed Protected Forest Land to be diverted (Forest Conservation Act 1980… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be diverted (Forest Conservation Act 1980… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.