Quick answers
What is this project?
Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas Private Limited is a lapsed road project in Chandwak, Kerakat, Jaunpur, Uttar Pradesh. The site covers 0.4 acres.
Who is building it?
The applicant is Indianoil-Adani Gas Pvt.Ltd..
Has it been approved?
No. The application was lapsed on 11 Dec 2025, so it is no longer under consideration.
Where is it?
In Chandwak, Kerakat, Jaunpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹20.9 crore; a site of 0.4 acres and 1,620 m² of forest land.
When was it filed?
The application was filed on 12 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas Private Limited
Project details
| Official title | Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas Private Limited along with road on NH-28 (Khujji More to Chandwak Tiraha) Total length 3.231 km in District- Jaunpur (U.P) |
|---|---|
| Status | Lapsed |
| Status since | 11 Dec 2025 |
| Application filed | 12 Sept 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Indianoil-Adani Gas Pvt.Ltd. |
| Land area | 1,600 m² |
| Forest land | 1,620 m² |
| Project cost | ₹20.9 crore |
| Village / locality | Chandwak |
| Taluk / tehsil | Kerakat |
| District | Jaunpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05690 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Oct 2025 | Forest land use approved | 0.4 acres | ₹20.9 crore |
| Change of use filed 12 Sept 2025 (this page) | Lapsed | 0.4 acres | ₹20.9 crore |
In context
14 applications in Jaunpur since January 2022 are in the same category (Roads & highways): 7 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 0.4 acres, this one is smaller than 100% of them.
Where it is
Chandwak, Kerakat, Jaunpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas… — forest land use approved, 0 m away
- Protected Forest to Be Diverted for the Work of Construction of 4 Lane Jaunpur… — forest land use approved, 30.1 km away
- Proposed Forest Land to Be Diverted for Construction of Rob — forest land use approved, 32.4 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — more information requested, 33.3 km away
- New District Jail (Capacity 1026) at Rasaina, District- Jaunpur, Uttar Pradesh… — environmental approval granted, 36.2 km away
- Proposed forest land to be diverted for Construction of 4 Lane Railway Over… — forest land use approved, 36.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 38.6 km away
- Forest land proposed to be diverted construction Over Bridge at NH-135A… — lapsed, 39.8 km away
All 14 Indianoil-Adani Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.