Quick answers
What is this project?
Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas Private Limited is an approved pipeline project in Chandwak, Kerakat, Jaunpur, Uttar Pradesh. The site covers 0.4 acres.
Who is building it?
The applicant is Indianoil-Adani Gas Pvt.Ltd..
Has it been approved?
Yes. Its status is “Forest land use approved” (since 24 Apr 2026), as of 27 Nov 2026.
Where is it?
In Chandwak, Kerakat, Jaunpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹20.9 crore; a site of 0.4 acres and 1,620 m² of forest land.
When was it filed?
The application was filed on 8 Oct 2025.
Project details
| Official title | Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas Private Limited along with road on NH-28 (Khujji More to Chandwak Tiraha) Total length 3.231 km in District- Jaunpur (U.P) |
|---|---|
| Status | Forest land use approved |
| Status since | 24 Apr 2026 |
| Application filed | 8 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indianoil-Adani Gas Pvt.Ltd. |
| Land area | 1,600 m² |
| Forest land | 1,620 m² |
| Project cost | ₹20.9 crore |
| Village / locality | Chandwak |
| Taluk / tehsil | Kerakat |
| District | Jaunpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05691 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Oct 2025 (this page) | Forest land use approved | 0.4 acres | ₹20.9 crore |
| Change of use filed 12 Sept 2025 | Lapsed | 0.4 acres | ₹20.9 crore |
Where it is
Chandwak, Kerakat, Jaunpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas… — lapsed, 0 m away
- Protected Forest to Be Diverted for the Work of Construction of 4 Lane Jaunpur… — forest land use approved, 30.1 km away
- Proposed Forest Land to Be Diverted for Construction of Rob — forest land use approved, 32.4 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — more information requested, 33.3 km away
- New District Jail (Capacity 1026) at Rasaina, District- Jaunpur, Uttar Pradesh… — environmental approval granted, 36.2 km away
- Proposed forest land to be diverted for Construction of 4 Lane Railway Over… — forest land use approved, 36.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 38.6 km away
- Forest land proposed to be diverted construction Over Bridge at NH-135A… — lapsed, 39.8 km away
All 14 Indianoil-Adani Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.