Quick answers
What is this project?
Diversion for Proposed Protected Forest Land To Be Diverted For Entry And Exit To Reliance BP Mobility Limited, By Proposed a Retail Outlet On Fatehpur-Bahua-Hinauta Road (SH-170), In KM 65 (Chainage- 64.863 to 64.908, RHS) (Increasing Chainage Towards Asothar) at Khasra No- 1409, Village- Sakri, Tahsil – Fatehpur Sadar, District- Fatehpur, Uttar Pradesh is a lapsed fuel station in Sarki, Fatehpur, Uttar Pradesh. The site covers 1.1 acres.
Who is building it?
The applicant is Reliance Bp Mobility Limited Up (West).
Has it been approved?
No. The application was lapsed on 24 Sept 2026, so it is no longer under consideration.
Where is it?
In Sarki, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore; a site of 1.1 acres and 2,520 m² of forest land.
When was it filed?
The application was filed on 24 Aug 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Sept 2026 |
| Application filed | 24 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Reliance Bp Mobility Limited Up (West) |
| Land area | 1.1 acres (0.5 ha) |
| Forest land | 2,520 m² |
| Project cost | ₹1.1 crore |
| Village / locality | Sarki |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05598 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1.1 acres, this one is larger than 74% of them.
Where it is
Sarki, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening of Fatehpur-Baberu-Attara-Naraini-Kartal Marg (SH-71) From Ch. 1.100… — lapsed, 5.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — forest land use approved, 7.5 km away
- Proposed "Morrum" Project at Khand No.- 04, Gata No.- 256, 281, 282, 283, 284,… — under environmental review, 8.9 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 10.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — under forest review, 10.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 10.4 km away
- Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to… — forest land use approved, 10.8 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — forest land use approved, 11.2 km away
All 23 Reliance Bp Mobility projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.