Quick answers
What is this project?
Forest Clearance Regarding Non-Forestry Use of 0.6409 Hectares of Roadside Protected Forest Land for Sub-Soil Laying of Drinking Water Pipeline on the Right-Hand Side From Km 19.388 to 20.278, Km 24.490 to 27.050, Km 38.855 to 39.775, Km 43.960 to 44.570, Km 44.570 to 45.710, Km 46.780 to 49.420, and Km 49.420 to 49.810 Along Shikohabad-Etah Road (SH-85) to Provide Surface Water Source (Gangajal) for Rural Habitations of District Firozabad is a lapsed pipeline project in Jahanpur, Jasrana, Firozabad, Uttar Pradesh. The site covers 34.3 acres.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
No. The application was lapsed on 3 Nov 2026, so it is no longer under consideration.
Where is it?
In Jahanpur, Jasrana, Firozabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,313.2 crore; a site of 34.3 acres and 1.6 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 16 Jul 2026.
Project details
| Official title | Proposal for Forest Clearance Regarding Non-Forestry Use of 0.6409 Hectares of Roadside Protected Forest Land for Sub-Soil Laying of Drinking Water Pipeline on the Right-Hand Side From Km 19.388 to 20.278, Km 24.490 to 27.050, Km 38.855 to 39.775, Km 43.960 to 44.570, Km 44.570 to 45.710, Km 46.780 to 49.420, and Km 49.420 to 49.810 Along Shikohabad-Etah Road (SH-85) to Provide Surface Water Source (Gangajal) for Rural Habitations of District Firozabad . |
|---|---|
| Status | Lapsed |
| Status since | 3 Nov 2026 |
| Application filed | 16 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Executive Engineer |
| Land area | 34.3 acres (13.9 ha) |
| Forest land | 1.6 acres (0.6 ha) |
| Project cost | ₹1,313.2 crore |
| Village / locality | Jahanpur |
| Taluk / tehsil | Jasrana |
| District | Firozabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06061 |
In context
6 applications in Firozabad since January 2022 are in the same category (Pipelines): 0 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Jahanpur, Jasrana, Firozabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amended BharatNet Project (EKA-Firozabad) — lapsed, 14.4 km away
- "Ordinary Soil Mining" Project at Gata No.- 18, 19, 20, 21, 37, Village-… — environmental approval granted, 14.9 km away
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed, 16.6 km away
- Jalalpur Marghati Soil Mining Project — environmental approval granted, 17.6 km away
- Proposed Protected Forest Land to Be Diverted for Entry and Exit of Bharat… — forest land use approved, 18.3 km away
- Diversion of 0.0110 Hectare of protected Forest land Under Social Forestry… — forest land use approved, 18.6 km away
- Amended BharatNet Project (Shikohabad-Firozabad) — lapsed, 18.9 km away
- Diversion of Forest Land for the Construction of 400 KV D/C Ghiror-Firozabad… — in-principle approval, conditions pending, 20.1 km away
More from Executive Engineer in Firozabad
- Forest Clearance Regarding Non-Forestry Use of Roadside Protected Forest Land… — lapsed
- • Proposal for the Diversion of Road Side Protected Forest for Laying Water… — lapsed
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.