Quick answers
What is Ordinary Soil Excavation Project?
Ordinary Soil Excavation Project is an approved mining project in Mawaiya, Bindki, Fatehpur, Uttar Pradesh. The site covers 3.4 acres.
Who is building it?
The applicant is Aditya Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Sept 2022), as of 27 Nov 2026.
Where is it?
In Mawaiya, Bindki, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹17 lakh and a site of 3.4 acres.
When was it filed?
The application was filed on 23 Sept 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Sept 2022 |
| Application filed | 23 Sept 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Aditya Singh |
| Land area | 3.4 acres (1.4 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Mawaiya |
| Taluk / tehsil | Bindki |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00208 |
In context
62 applications in Fatehpur since January 2022 are in the same category (Mining): 42 approved, 18 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.4 acres, this one is smaller than 98% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mawaiya, Bindki, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 1.9 km away
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 2.3 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 2.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested, 3.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach of… — lapsed, 3.6 km away
- Proposed Stand-alone Grinding Unit — cleared for impact study, 8 km away
- Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0… — lapsed, 8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — forest land use approved, 8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.