Quick answers
What is Amended BharatNet Program (ABP)?
Amended BharatNet Program (ABP) is a proposed pipeline project in Mundiya Jagr, Baheri, Bareilly, Uttar Pradesh. The site covers 1.4 acres.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Mundiya Jagr, Baheri, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4 lakh; a site of 1.4 acres and 1.4 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 28 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 28 Oct 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Pipelines |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Mundiya Jagr |
| Taluk / tehsil | Baheri |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07013 |
In context
9 applications in Bareilly since January 2022 are in the same category (Pipelines): 1 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Mundiya Jagr, Baheri, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Integrated Municipal Solid Waste Management Facility" with capacity of 500TPD — more information requested, 5.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 5.6 km away
- Proposed Protected Forest Land to Be Diverted for Entry & Exit Approach to… — forest land use approved, 6.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 6.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 7.2 km away
- Forest Land Proposed to be diverted for approach access to HPCL Retail Outlet… — forest land use approved, 7.5 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 7.8 km away
- Amended BharatNet Project (Kyara-Bareilly) — lapsed, 8.5 km away
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.