Quick answers
What is this project?
Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet is an approved fuel station in Mahrupur Suhju, Farrukhabad, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is M/S Nayara Energy Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Apr 2026), as of 27 Nov 2026.
Where is it?
In Mahrupur Suhju, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 1 acre and 2,260 m² of forest land.
When was it filed?
The application was filed on 30 Apr 2025.
Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet at Village: - Mahrupur Sahju, Tehsil:- Farrukhabad, District:- Farrukhabad. |
|---|---|
| Status | Forest land use approved |
| Status since | 15 Apr 2026 |
| Application filed | 30 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 3,900 m² |
| Forest land | 2,260 m² |
| Project cost | ₹65 lakh |
| Village / locality | Mahrupur Suhju |
| Taluk / tehsil | Farrukhabad |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06637 |
In context
9 applications in Farrukhabad since January 2022 are in the same category (Fuel stations): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahrupur Suhju, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Excavation Project — more information requested, 2 km away
- proposed "Ordinary Soil Excavation Project" at Gata No.- 128Mi, 129 (Total… — environmental approval granted, 3.1 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 4.2 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 4.3 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to Major… — lapsed, 5 km away
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — more information requested, 6 km away
- Proposed Protected Forest Land To Be Diverted For Entry And Exit To Bharat… — initial checks, 6.1 km away
- Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of… — forest land use approved, 7.5 km away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.