Quick answers
What is Ordinary Soil Excavation Project?
Ordinary Soil Excavation Project is a proposed mining project in Hussianpur Naukhanda, Farrukhabad, Uttar Pradesh. The site covers 0.1 acres.
Who is building it?
The applicant is Satyam Mishra.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Hussianpur Naukhanda, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹18 lakh and a site of 0.1 acres.
When was it filed?
The application was filed on 9 Aug 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 9 Aug 2023 |
| Application filed | 9 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Satyam Mishra |
| Land area | 300 m² |
| Project cost | ₹18 lakh |
| Village / locality | Hussianpur Naukhanda |
| Taluk / tehsil | Farrukhabad |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00519 |
In context
13 applications in Farrukhabad since January 2022 are in the same category (Mining): 10 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.1 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Hussianpur Naukhanda, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- proposed "Ordinary Soil Excavation Project" at Gata No.- 128Mi, 129 (Total… — environmental approval granted, 1.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — forest land use approved, 2 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to Major… — lapsed, 3.6 km away
- Proposed Protected Forest Land To Be Diverted For Entry And Exit To Bharat… — initial checks, 4.6 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 5.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 6.2 km away
- Widening and Strengthening of Fatehgarh Gursahayganj Road — lapsed, 7.7 km away
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — more information requested, 8 km away