Quick answers
What is this project?
Proposed protected forest land to be diverted for Entry/Exit approach to Major S.D. Singh University is a lapsed building project in Bhulanpur Chirpura, Farrukhabad, Uttar Pradesh. The site covers 2.9 acres.
Who is building it?
The applicant is Shri Babu Singh Dadduji Educational Trust.
Has it been approved?
No. The application was lapsed on 2 Jun 2024, so it is no longer under consideration.
Where is it?
In Bhulanpur Chirpura, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹20 lakh; a site of 2.9 acres and 300 m² of forest land.
When was it filed?
The application was filed on 13 Feb 2024.
Project details
| Official title | Proposed protected forest land to be diverted for Entry/Exit approach to Major S.D. Singh University at Village: -Bhoolanpur Chirpura, Tehsil:- Sadar, District:- Farrukhabad. |
|---|---|
| Status | Lapsed |
| Status since | 2 Jun 2024 |
| Application filed | 13 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shri Babu Singh Dadduji Educational Trust |
| Land area | 2.9 acres (1.2 ha) |
| Forest land | 300 m² |
| Project cost | ₹20 lakh |
| Village / locality | Bhulanpur Chirpura |
| Taluk / tehsil | Farrukhabad |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05793 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhulanpur Chirpura, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land To Be Diverted For Entry And Exit To Bharat… — initial checks, 1.1 km away
- proposed "Ordinary Soil Excavation Project" at Gata No.- 128Mi, 129 (Total… — environmental approval granted, 2.7 km away
- Ordinary Soil Excavation Project — more information requested, 3.6 km away
- Widening and Strengthening of Fatehgarh Gursahayganj Road — lapsed, 4.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — forest land use approved, 5 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 6.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 9.1 km away
- Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of… — forest land use approved, 9.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.