Quick answers
What is this project?
IOCL Retail Outlet on Bhitaura-Shahi-Shergarh-Bahedi Road (MDR-168W) at Km. 6 (On LHS) ,At Gata No.278,279 Village: Gouhana, Tehsil: Meerganj, District: Bareilly (UP) is an approved fuel station in Gohana, Meerganj, Bareilly, Uttar Pradesh. The site covers 0.4 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 4 May 2026), as of 27 Nov 2026.
Where is it?
In Gohana, Meerganj, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 0.4 acres and 590 m² of forest land.
When was it filed?
The application was filed on 24 Oct 2022.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 4 May 2026 |
| Application filed | 24 Oct 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1,800 m² |
| Forest land | 590 m² |
| Project cost | ₹45 lakh |
| Village / locality | Gohana |
| Taluk / tehsil | Meerganj |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06734 |
In context
25 applications in Bareilly since January 2022 are in the same category (Fuel stations): 17 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.4 acres, this one is smaller than 87% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gohana, Meerganj, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amended BharatNet Project (Fatehganj West-Bareilly) — lapsed, 600 m away
- Protected Forest Land is Proposed to be diverted for Entry/Exit Approach road… — lapsed, 650 m away
- Proposed Protected Forest Land to be Diverted for Construction of 02 lane rail… — under forest review, 4 km away
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to Bharat… — lapsed, 5.5 km away
- Bhumi Vikas Evam Grahsthan Scheme — environmental approval granted, 7.7 km away
- Bhumi Vikas Evam Grahsthan Scheme — cleared for impact study, 7.7 km away
- Proposed BPCL Retail Outlet at Delhi-Lucknow Road km. between 221 to 222 ,… — forest land use approved, 7.9 km away
- Protected Forest Land Proposed to be diverted for Indian Oil Corporation… — forest land use approved, 8 km away
7 Indian Oil Corporation (IOCL) projects in Bareilly
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.