Quick answers
What is Amended BharatNet Project (Fatehganj West-Bareilly)?
Amended BharatNet Project (Fatehganj West-Bareilly) is a lapsed telecom project in Agras, Meerganj, Bareilly, Uttar Pradesh. The site covers 3,622.4 acres.
Who is building it?
The applicant is Rail Vikas Nigam Limited (RVNL).
Has it been approved?
No. The application was lapsed on 10 Sept 2026, so it is no longer under consideration.
Where is it?
In Agras, Meerganj, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹48 lakh; a site of 3,622.4 acres and 2,330 m² of forest land.
When was it filed?
The application was filed on 7 Aug 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Sept 2026 |
| Application filed | 7 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Rail Vikas Nigam Limited (RVNL) |
| Land area | 3,622.4 acres (1,465.9 ha) |
| Forest land | 2,330 m² |
| Project cost | ₹48 lakh |
| Village / locality | Agras |
| Taluk / tehsil | Meerganj |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07227 |
In context
8 applications in Bareilly since January 2022 are in the same category (Telecom): 1 approved, 0 filed or under review, and 7 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Agras, Meerganj, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- IOCL Retail Outlet on Bhitaura-Shahi-Shergarh-Bahedi Road (MDR-168W) at Km. 6… — forest land use approved, 600 m away
- Protected Forest Land is Proposed to be diverted for Entry/Exit Approach road… — lapsed, 1.2 km away
- Proposed Protected Forest Land to be Diverted for Construction of 02 lane rail… — under forest review, 4.2 km away
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to Bharat… — lapsed, 5.7 km away
- Proposed BPCL Retail Outlet at Delhi-Lucknow Road km. between 221 to 222 ,… — forest land use approved, 7.3 km away
- Protected Forest Land Proposed to be diverted for Indian Oil Corporation… — forest land use approved, 7.4 km away
- Bhumi Vikas Evam Grahsthan Scheme — environmental approval granted, 8.2 km away
- Bhumi Vikas Evam Grahsthan Scheme — cleared for impact study, 8.2 km away
More from Rail Vikas Nigam Limited (RVNL) in Bareilly
- Amended BharatNet Project (Kyara-Bareilly) — lapsed
- Amended Bharatnet Project (Faridpur-Bareilly) — lapsed
- Amended BharatNet Project (Alampur Jafrabad-Bareilly) — lapsed
- Amended BharatNet Project (Damkhauda-Bareilly) — lapsed
- Amended Bharat Net — lapsed
6 Rail Vikas Nigam (RVNL) projects in Bareilly
All 82 Rail Vikas Nigam (RVNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.