Quick answers
What is this project?
Proposed Reserved Forest Land to Be Diverted for Construction of Bridge, Approach Road, Additional Approach Road and Its Protective Work is a lapsed road project in Kachir, Garautha, Jhansi, Uttar Pradesh. The site covers 229 acres.
Who is building it?
The applicant is Bridge Corporation Limited.
Has it been approved?
No. The application was lapsed on 20 May 2026, so it is no longer under consideration.
Where is it?
In Kachir, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹108.1 crore; a site of 229 acres and 35.4 acres (14.3 ha) of forest land.
When was it filed?
The application was filed on 16 May 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Reserved Forest Land to Be Diverted for Construction of Bridge, Approach Road,…
Project details
| Official title | Proposed Reserved Forest Land to Be Diverted for Construction of Bridge, Approach Road, Additional Approach Road and Its Protective Work in District:- Jhansi & Hamirpur. |
|---|---|
| Status | Lapsed |
| Status since | 20 May 2026 |
| Application filed | 16 May 2026 |
| Approval sought | Forest land use |
| Application type | Ownership transfer |
| Sector | Roads & highways |
| Applicant | Bridge Corporation Limited |
| Land area | 229 acres (92.7 ha) |
| Forest land | 35.4 acres (14.3 ha) |
| Project cost | ₹108.1 crore |
| Village / locality | Kachir |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05236 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 27 May 2026 | In-principle approval, conditions pending | 229 acres | ₹108.1 crore |
| Ownership transfer filed 16 May 2026 (this page) | Lapsed | 229 acres | ₹108.1 crore |
| New project filed 24 Nov 2024 | In-principle approval, conditions pending | 284.8 acres | ₹108.1 crore |
In context
12 applications in Jhansi since January 2022 are in the same category (Roads & highways): 1 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. At 229 acres, this one is larger than 64% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kachir, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 0 m away
- Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road,… — lapsed, 0 m away
- Proposed Reserved Forest Land to Be Diverted for Construction of Bridge,… — in-principle approval, conditions pending, 0 m away
- Sand/ Morrum Mining from Dhasan Riverbed — environmental approval granted, 3.1 km away
- "Sand/Morrum Mining" at Gata No. 118kha (Khand No.1), Village- Ramora, Tehsil-… — under environmental review, 4.5 km away
- Morrum Mining from Dhasan River Bed — environmental approval granted, 5.7 km away
- Morrum Mining from Dhasan River Bed — cleared for impact study, 5.7 km away
- Environmental Clearance for Proposed Sand/Morrum Mining from Dhasan Riverbed… — lapsed, 5.7 km away
More from Bridge Corporation Limited in Jhansi
- Proposed Forest Land to be diverted for construction of River Bridge — forest land use approved
- Proposed Reserved Forest Land to be diverted for construction of Betwa River… — lapsed
All 5 Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.