Quick answers
What is City Gas Distribution network in Jagdishpur?
City Gas Distribution network in Jagdishpur is a proposed pipeline project in Azadpur, Tiloi, Amethi, Uttar Pradesh. The site covers 0.9 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Azadpur, Tiloi, Amethi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4 crore; a site of 0.9 acres and 3,460 m² of forest land.
When was it filed?
The application was filed on 9 Apr 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 11 Aug 2026 |
| Application filed | 9 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,500 m² |
| Forest land | 3,460 m² |
| Project cost | ₹4 crore |
| Village / locality | Azadpur |
| Taluk / tehsil | Tiloi |
| District | Amethi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06873 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Azadpur, Tiloi, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 1.7 km away
- Transfer of Environmental clearance from Indo-Gulf Fertilizers Limited (a unit… — environmental approval granted, 6.4 km away
- Transfer of Environmental clearance from Indo-Gulf Fertilizers Limited (a unit… — returned to applicant, 6.4 km away
- Proposed Brownfield Urea Expansion Project having a capacity of 2500 TPD… — under environmental review, 6.5 km away
- Proposed Forest Land to Be Diverted for Entry/Exit Approach to Other Property… — lapsed, 6.7 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) Amethi at Villages… — under environmental review, 7 km away
- Project for Laying of Optical Fiber Cable (OFC) — lapsed, 27.6 km away
- Proposed Forest Land to be diverted for Temprary Road Construction Work for… — forest land use approved, 27.6 km away
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.