Quick answers
What is this project?
Proposed Forest Land to Be Diverted for Entry/Exit Approach to Other Property of Sandeep Tiwari and Sachin Tiwari is a lapsed building project in Naukhera, Tiloi, Amethi, Uttar Pradesh. The site covers 4.8 acres.
Who is building it?
The applicant is Nagender Tiwari.
Has it been approved?
No. The application was lapsed on 18 Aug 2025, so it is no longer under consideration.
Where is it?
In Naukhera, Tiloi, Amethi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh; a site of 4.8 acres and 1.8 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 11 Jul 2025.
Project details
| Official title | Proposed Forest Land to Be Diverted for Entry/Exit Approach to Other Property of Sandeep Tiwari and Sachin Tiwari at Village: - Naukheda, Tehsil: - Tiloi, District: - Amethi. |
|---|---|
| Status | Lapsed |
| Status since | 18 Aug 2025 |
| Application filed | 11 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Nagender Tiwari |
| Land area | 4.8 acres (2 ha) |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Naukhera |
| Taluk / tehsil | Tiloi |
| District | Amethi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07079 |
In context
6 applications in Amethi since January 2022 are in the same category (Buildings & townships): 3 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Naukhera, Tiloi, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- City Gas Distribution network in Jagdishpur — more information requested, 6.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 8.4 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) Amethi at Villages… — under environmental review, 10.5 km away
- Transfer of Environmental clearance from Indo-Gulf Fertilizers Limited (a unit… — environmental approval granted, 13.1 km away
- Transfer of Environmental clearance from Indo-Gulf Fertilizers Limited (a unit… — returned to applicant, 13.1 km away
- Proposed Brownfield Urea Expansion Project having a capacity of 2500 TPD… — under environmental review, 13.2 km away
- Proposed Forest Land to be diverted for Temprary Road Construction Work for… — forest land use approved, 34.3 km away
- Project for Laying of Optical Fiber Cable (OFC) — lapsed, 34.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.