Quick answers
What is Amended BharatNet Project (Kyara-Bareilly)?
Amended BharatNet Project (Kyara-Bareilly) is a lapsed telecom project in Anguri, Bareilly, Uttar Pradesh. It seeks 0.1 acres of forest land.
Who is building it?
The applicant is Rail Vikas Nigam Limited (RVNL).
Has it been approved?
No. The application was lapsed on 15 Aug 2026, so it is no longer under consideration.
Where is it?
In Anguri, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹11 lakh and 540 m² of forest land.
When was it filed?
The application was filed on 13 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Aug 2026 |
| Application filed | 13 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Rail Vikas Nigam Limited (RVNL) |
| Forest land | 540 m² |
| Project cost | ₹11 lakh |
| Village / locality | Anguri |
| Taluk / tehsil | Bareilly |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06121 |
In context
8 applications in Bareilly since January 2022 are in the same category (Telecom): 1 approved, 0 filed or under review, and 7 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anguri, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Lying 4" dia CS and 125mm… — more information requested, 1.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 2.4 km away
- Environment Clearance of proposed "Upgradation and renovation of District Jail… — environmental approval granted, 4.9 km away
- Proposed Residential Plotted Development and Commercial Development at Chaupla… — initial checks, 5.4 km away
- Improvement & Up-gradation of NH-530B section of Western Spur of Bareilly in… — in-principle approval, conditions pending, 6.5 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 7.3 km away
- Forest Land Proposed to be diverted for approach access to HPCL Retail Outlet… — forest land use approved, 8.1 km away
- Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line… — forest land use approved, 8.1 km away
More from Rail Vikas Nigam Limited (RVNL) in Bareilly
- Amended BharatNet Project (Fatehganj West-Bareilly) — lapsed
- Amended Bharatnet Project (Faridpur-Bareilly) — lapsed
- Amended BharatNet Project (Alampur Jafrabad-Bareilly) — lapsed
- Amended BharatNet Project (Damkhauda-Bareilly) — lapsed
- Amended Bharat Net — lapsed
6 Rail Vikas Nigam (RVNL) projects in Bareilly
All 82 Rail Vikas Nigam (RVNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.