Quick answers
What is this project?
Proposal of re-diversion for Jio Digital Fibre Private Limited Project for Laying of Optical Fibre Cable (OFC) is a proposed telecom project in Ratausa, Mauranipur, Jhansi, Uttar Pradesh. The site covers 3.7 acres.
Who is building it?
The applicant is Jio Digital Fiber Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Ratausa, Mauranipur, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.5 crore; a site of 3.7 acres and 3.6 acres (1.5 ha) of forest land.
When was it filed?
The application was filed on 5 Oct 2025.
Project details
| Official title | Proposal of re-diversion for Jio Digital Fibre Private Limited Project for Laying of Optical Fibre Cable (OFC) along with road, within the already diverted RoW of roads at NH-25 (Orai-Moth-Jhansi Road, Left/Right Side) from Km. 106.000 to Km. 154.470, from Km. 154.600 to Km 156.400, from Km. 158.200 to Km. 168.700, from Km. 168.900 to Km. 173.100 & from Km. 173.800 to Km. 178.000, at NH-76 (Jhansi-Mauranipur Road, Left/Right Side) from Km. 1.900 to Km. 5.900, from Km. 7.500 to Km. 12.900, from K |
|---|---|
| Status | More information requested |
| Status since | 3 Dec 2025 |
| Application filed | 5 Oct 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Jio Digital Fiber Private Limited |
| Land area | 3.7 acres (1.5 ha) |
| Forest land | 3.6 acres (1.5 ha) |
| Project cost | ₹3.5 crore |
| Village / locality | Ratausa |
| Taluk / tehsil | Mauranipur |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07037 |
In context
5 applications in Jhansi since January 2022 are in the same category (Telecom): 0 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Ratausa, Mauranipur, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental clearance for proposed Sand/Morrum mining from River bed of… — environmental approval granted, 9.3 km away
- River Bed Sand/ Morrum Mining — under environmental review, 10.6 km away
- River Bed Sand/ Morrum Mining — cleared for impact study, 10.6 km away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 12.1 km away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 12.2 km away
- Building Stone (Khanda, Gitti, Boulder, Ballast) Mining Project — environmental approval granted, 12.4 km away
- Building Stone (Khanda, Giiti, Boulder, Ballast) Mining Project — withdrawn, 12.4 km away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — lapsed, 12.5 km away
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.