| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet at Village:-Ramsanda, Tehsil:-Unchahar, District:- Raebareli. |
|---|---|
| Status | Forest land use approved |
| Status since | 13 Aug 2026 |
| Application filed | 4 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 3,810 m² |
| Project cost | ₹55 lakh |
| Village / locality | Ramsanda |
| Taluk / tehsil | Unchahar |
| District | Rae Bareli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07056 |
In context
11 applications in Rae Bareli since January 2022 are in the same category (Fuel stations): 7 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1.2 acres, this one is larger than 91% of them.
Where it is
Ramsanda, Unchahar, Rae Bareli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 7 km away
- Feroze Gandhi Unchahar Thermal Power Station, Stage - II (2x210MW) — environmental approval granted, 9.2 km away
- Expansion by addition of 500 MW (Stage-IV) Coal Based Thermal Power Plant at… — environmental approval granted, 9.2 km away
- 1x210 MW Feroze Gandhi Unchahar Thermal Power Project (FGUTPP) Stage-III… — returned to applicant, 9.2 km away
- Feroze Gandhi Unchahar Thermal Power Project, Stage-I — lapsed, 9.3 km away
- Feroze Gandhi Unchahar Thermal Power Station, Stage-I — lapsed, 9.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 13 km away
- Waste management project by Ferrosang Enviro Solutions Private Limited — lapsed, 17.5 km away
More from Indian Oil Corporation Limited (IOCL) in Rae Bareli
- Proposed Forest Land to be diverted for Entry/Exit Approach to IOCL Retail… — in-principle approval, conditions pending
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved
7 Indian Oil Corporation (IOCL) projects in Rae Bareli
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.