What is Developing? Open the mapMap

Cleared for impact studyIndustry · Paschim Bardhaman, West Bengal

Proposed expansion of existing Steel Plant for replacement of existing 2x7 T Induction Furnaces by 2x15 T Induction Furnaces, installation of new 2x15 T Induction Furnaces with 6/11 three strands Continuous Casting Machine (2,00,000 TPA Billets) & 1x15 TPH Slag Crusher unit, 1x30 T capacity AOD and Hot Rolling Mill (450 TPD) for production of TMT Bars, Wire Rod, Structure with 1x15 TPH Reheating Furnace (reheating by Piped-Gas or Coal or 1x45,00,000 Kcal/hr capacity Coal based Gasifier)

Proposed expansion of existing Steel Plant for replacement of existing 2x7 T Induction Furnaces by 2x15 T Induction Furnaces, installation of new 2x15 T Induction Furnaces with 6/11 three strands Continuous Casting Machine (2,00,000 TPA Billets) & 1x15 TPH Slag Crusher unit, 1x30 T capacity AOD and Hot Rolling Mill (450 TPD) for production of TMT Bars, Wire Rod, Structure with 1x15 TPH Reheating Furnace (reheating by Piped-Gas or Coal or 1x45,00,000 Kcal/hr capacity Coal based Gasifier) is a proposed industrial project in Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The site covers 9.9 acres. Its stated project cost is ₹95 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 14 Feb 2023).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of existing Steel Plant for replacement of existing 2x7 T Induction…

Project details

StatusCleared for impact study
Status since14 Feb 2023
Application filed14 Feb 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantCrm Ispat Private Limited
Land area9.9 acres (4 ha)
Project cost₹95 crore
Village / localityBamunara
Taluk / tehsilKanksa
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00049

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 31 Jul 2024Environmental approval granted9.9 acres₹95 crore
Early planning filed 14 Feb 2023 (this page)Cleared for impact study9.9 acres₹95 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is smaller than 80% of them.

33 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.