| Status | Environmental approval granted |
|---|---|
| Status since | 16 Sept 2022 |
| Application filed | 16 Sept 2022 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Vsp Udyog PVT. LTD. |
| Land area | 21.8 acres (8.8 ha) |
| Project cost | ₹190.8 crore |
| Village / locality | Bamunara |
| Taluk / tehsil | Kanksa |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00056 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 1 Mar 2024 | Lapsed | 21.8 acres | ₹190.8 crore |
| Expansion filed 16 Sept 2022 (this page) | Environmental approval granted | 21.8 acres | ₹190.8 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 21.8 acres, this one is smaller than 63% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4 x 20 Tonnes Induction furnaces with Ladle Refining Furnace, CCM and… — lapsed, 0 m away
- "No Increase in Pollution Load" Certificate for configuration change in… — initial checks, 0 m away
- Expansion of existing steel plant 2 x 6 Tonne to 4 x 25 Tonne Induction… — cleared for impact study, 200 m away
- Blast Furnace at L.R. Plot No. 2427, 2428, 4654, 4665, 4707, 4672, 4706, 4695,… — withdrawn, 250 m away
- Proposed Expansion of existing DI Pipe Manufacturing Unit by installation of… — lapsed, 600 m away
- Blast Furnace with Pig Casting Machine, Captive Power Plant, Sinter Plant at… — withdrawn, 600 m away
- Proposed expansion of existing Steel Plant for replacement of existing 2x7 T… — environmental approval granted, 750 m away
- Proposed expansion of existing Steel Plant for replacement of existing 2x7 T… — cleared for impact study, 750 m away
More from Vsp Udyog PVT. LTD. in Paschim Bardhaman
All 3 Vsp Udyog projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.