4 x 20 Tonnes Induction furnaces with Ladle Refining Furnace, CCM and expansion of Wire Rod/Rolling Mill capacity from 1,20,000 to 2,50,000 TPA

4 x 20 Tonnes Induction furnaces with Ladle Refining Furnace, CCM and expansion of Wire Rod/Rolling Mill capacity from 1,20,000 to 2,50,000 TPA is a lapsed industrial project in Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The site covers 21.8 acres. Its stated project cost is ₹190.8 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: 4 x 20 Tonnes Induction furnaces with Ladle Refining Furnace, CCM and expansion of Wire…

Project details

StatusLapsed
Status since29 Oct 2024
Application filed1 Mar 2024
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantVsp Udyog PVT. LTD.
Land area21.8 acres (8.8 ha)
Project cost₹190.8 crore
Village / localityBamunara
Taluk / tehsilKanksa
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00837

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 1 Mar 2024 (this page)Lapsed21.8 acres₹190.8 crore
Expansion filed 16 Sept 2022Environmental approval granted21.8 acres₹190.8 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 21.8 acres, this one is smaller than 63% of them.

30 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vsp Udyog PVT. LTD. in Paschim Bardhaman

All 3 Vsp Udyog projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.