Environmental approval grantedIndustry · Paschim Bardhaman, West Bengal

Proposed expansion of existing Steel Plant for replacement of existing 2x7 T Induction Furnaces by 2x15 T Induction Furnaces, installation of new 2x15 T Induction Furnaces with 6/11 three strands Continuous Casting Machine (2,00,000 TPA Billets) & 1x15 TPH Slag Crusher unit, 1x30 T capacity AOD and Hot Rolling Mill (450 TPD) for production of TMT Bars, Wire Rod, Structure with 1x15 TPH Reheating Furnace (reheating by Piped-Gas or Coal or 1x45,00,000 Kcal/hr capacity Coal based Gasifier)

Proposed expansion of existing Steel Plant for replacement of existing 2x7 T Induction Furnaces by 2x15 T Induction Furnaces, installation of new 2x15 T Induction Furnaces with 6/11 three strands Continuous Casting Machine (2,00,000 TPA Billets) & 1x15 TPH Slag Crusher unit, 1x30 T capacity AOD and Hot Rolling Mill (450 TPD) for production of TMT Bars, Wire Rod, Structure with 1x15 TPH Reheating Furnace (reheating by Piped-Gas or Coal or 1x45,00,000 Kcal/hr capacity Coal based Gasifier) is an approved industrial project in Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The site covers 9.9 acres. Its stated project cost is ₹95 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 30 Sept 2024).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since30 Sept 2024
Application filed31 Jul 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantCrm Ispat Private Limited
Land area9.9 acres (4 ha)
Project cost₹95 crore
Village / localityBamunara
Taluk / tehsilKanksa
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00926

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 31 Jul 2024 (this page)Environmental approval granted9.9 acres₹95 crore
Early planning filed 14 Feb 2023Cleared for impact study9.9 acres₹95 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is smaller than 80% of them.

33 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.