Cleared for impact studyIndustry · Medinipur West, West Bengal

Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) & Rolling Mill (4,91000 Tpa to 5,50,000 Tpa) by Augmentation of Existing Technologies & Facilities; Sms (5,00,000 Tpa to 8,30,000 Tpa) by Installation of New 4 X 25 Ton If; Dip (7,70,000 Tpa to 11,00,000 Tpa) by Restructuring the Existing Facility Keeping Rest of the Ec Sanctioned Capacity As IT Is.

Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) & Rolling Mill (4,91000 Tpa to 5,50,000 Tpa) by Augmentation of Existing Technologies & Facilities; Sms (5,00,000 Tpa to 8,30,000 Tpa) by Installation of New 4 X 25 Ton If; Dip (7,70,000 Tpa to 11,00,000 Tpa) by Restructuring the Existing Facility Keeping Rest of the Ec Sanctioned Capacity As IT Is is a proposed industrial project in Teghari, Kharagpur - I, Medinipur West, West Bengal. The site covers 144 acres. Its stated project cost is ₹1,445 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 8 Nov 2023).

See it on the live map All projects in Medinipur West

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Integrated Steel Plant; Mbf –(5,00,000 Tpa to 5,50,000 Tpa) & Rolling Mill…

Project details

StatusCleared for impact study
Status since8 Nov 2023
Application filed30 Oct 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantRashmi Metaliks Limited
Land area144 acres (58.3 ha)
Project cost₹1,445 crore
Village / localityTeghari
Taluk / tehsilKharagpur - I
DistrictMedinipur West
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00156

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 27 Nov 2024Environmental approval granted144 acres₹1,445 crore
Early planning filed 30 Oct 2023 (this page)Cleared for impact study144 acres₹1,445 crore

In context

43 applications in Medinipur West since January 2022 are in the same category (Industry): 27 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 144 acres, this one is smaller than 51% of them.

25 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Teghari, Kharagpur - I, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.